Sap note 5615575/26/2023 ![]() KBA 2184974 - KV151 and KV169 occurred in Variance Calculation. ![]() ![]() Therefore the variance calculation issues message KV169 and cannot calculate target costs. The cost component split in controlling area currency is not active for the costing variant (check T-code: OKKN or OKY9). The target cost calculation requires a cost estimate for which the cost component split is active in company as well as in controlling area currency.KV169 No target costs because no price for material & CNP1 in currency &.It is not possible to release a cost estimate for a date in the past! In this case, the cost estimate has to be valid on the last day of the period. For the periodic settlement, the variances are calculated for the period.In this instance, the cost estimate must be valid on the final day of delivery (status DLV - see table AFPO-LTRMI), or if this has not yet happened, on the day of technical completion (status TECO - see table AUFK-IDAT2), or else on the day the order was created. For the full settlement, the variances are determined across the entire term of the order.The settlement type in the order determines at which point the cost estimate has to be valid: KV154 No standard cost estimate for material & in plant & on &
0 Comments
Leave a Reply. |